The tiremaker, according to the report, said that current global economic conditions and a general slowdown in the auto industry were to blame for the delay.
The plant, said Kumho, will be completed, but the timetable has been shifted. No new timetable was announced. The plant was scheduled to open in December 2009. (Tire Review/Akron)